|
|
 |
 |
| home |
| |
shopping |
| |
contact |
| |
projects |
| |
Warning: Undefined array key "session_logged_in" in /home2/sap/public_html/header.php on line 612
login | | | join |
|
 |
 |
 |
Family Room Makeover and Remodeling Project
|
 |
|
|
|
|
|
|
|
|
|
|
|
Finished Step
|
|
|
The new step is covered with the Ash flooring. The edge of the tread is made from Bull Nose ordered with the flooring. The baseboard heat pipe passing through the step is also boxed in using flooring. The finish wall trim on either side of step is not installed in this photo.
|
|
|
|
|
|
|
|
|
All projects on Shareaproject.com are user-submitted and should be used for reference information only. The projects are not intended to be complete "How-To" articles. Use the information contained in these projects at your own risk. Projects are not checked for completion, accuracy, or safety and therefore cannot be guaranteed in any way.
Outdoor Blog
|