Warning: Undefined array key "visitDate" in /home2/sap/public_html/header.php on line 6
Family Room Makeover and Remodeling Project - Time for new Floor - Slideshow View

Warning: Undefined array key "session_logged_in" in /home2/sap/public_html/header.php on line 612
home | shopping | contact | projects | login|join
     Family Room Makeover and Remodeling Project       
Search Projects:
 
Share Thumbnails Slideshow Tutorial
<<
>>
Time for new Floor
The room has a concrete floor that is above grade by about a foot or so. We wanted to install conventional hardwood flooring, but that would mean a sub floor be built and that would raise the floor above the sliding doors. So instead we went with an "Engineered Hardwood" floor by Kahrs. This floor is 3/8" Ash hardwood bonded to a lay of plywood. This floor can be nailed down, glued down, or floated over concrete. So we floated it. Even though the concrete is dry as a bone, we installed the vapor barrier to retain the floor warrentee. Floor is a locking tongue and groove install that is hammerd together. Fits tighter than anything I ever saw. Again, I got a lot of help from Jamie.
<<
>>
All projects on Shareaproject.com are user-submitted and should be used for reference information only. The projects are not intended to be complete "How-To" articles. Use the information contained in these projects at your own risk. Projects are not checked for completion, accuracy, or safety and therefore cannot be guaranteed in any way.
Outdoor Blog